欧美人妻精品一区二区三区99,中文字幕日韩精品内射,精品国产综合成人亚洲区,久久香蕉国产线熟妇人妻

Dez anos de domínio da cole??o de experiências de usinagem CNC (apenas entenda)

Na fábrica de moldes, o centro de usinagem CNC é usado principalmente para pe?as-chave do molde, como núcleos e insertos de molde, cobre e outros processamentos. A qualidade do molde e do inserto determina diretamente a qualidade da pe?a moldada do molde. A qualidade do processamento de cobre limita diretamente o impacto do processamento de EDM. Para garantir a qualidade do processamento CNC, a chave está na prepara??o antes do processamento. Além de ter uma rica experiência de processamento e conhecimento de moldes, devemos prestar aten??o à boa comunica??o, especialmente à comunica??o com a equipe de produ??o e colegas.

CNC machining process

1) Reading drawings and procedures

2) Transfer the corresponding program to the machine

3) Check the program head, cutting parameters, etc.

4) Determination of process size and margin on the workpiece

5) Reasonable clamping of the workpiece

6) Accurate alignment of the workpiece

7) Accurate establishment of workpiece coordinates

8) Selection of reasonable tools and cutting parameters

9) Reasonable clamping of the tool

10) Safe trial cutting method

11) Observation of the processing process

12) Adjustment of cutting parameters

13) Problems in the process and timely feedback from the corresponding personnel

14) Detection of workpiece quality after machining

Precautions before processing

1) For the new model, the processing map should meet the requirements, and the data is clear; the processing map of the new model must have the signature of the supervisor, and the columns of the processing map are filled out.

2) The workpiece has a qualified mark for the quality department.

3) After receiving the program list, check whether the workpiece reference position is consistent with the drawing reference position.

4) Look at each requirement on the program sheet to confirm that the program and drawing requirements are consistent. If there is a problem, you must solve the problem together with the programmer and the production team.

5) According to the material of the workpiece and its size, judge the rationality of the tool used by the programmer to open the rough or light knife program.

If the tool is found to be unreasonable, the programmer should be notified immediately to make changes to improve machining efficiency and workpiece machining accuracy.

Precautions for clamping workpieces

1) When clamping the workpiece, pay attention to the position of the pallet and the extension length of the nut-bolt on the pressure plate. In addition, the screw cannot be bottomed when the angle is locked.

2) Tonggong is generally used for lock plate processing. Before the machine is installed, it should be checked against the number of materials on the program sheet. At the same time, check whether the closing screw is tightened.

3) For the case where a board receives multiple pieces of copper material, check whether the direction is correct and whether the copper materials interfere during processing.

4) According to the shape of the program sheet and the data of the workpiece size, it is necessary to note that the workpiece size data is written as XxYxZ. At the same time, if there is a piece map, the graphics of the program sheet and the figure of the parts drawing must be checked. Whether it is consistent, pay attention to which direction to go out, and the X, Y axis of the pendulum.

5) When clamping the workpiece, it is necessary to check whether the workpiece size meets the size requirements of the program sheet. If there is a part drawing, it is necessary to check whether the size of the program sheet is the same as the size of the parts drawing.

6) The workbench and the bottom of the workpiece should be cleaned before the workpiece is placed on the machine. Apply the oil stone on the machine table and the workpiece surface to push off the burrs and the damaged position.

7) When the code is coded, make sure the chip is not damaged by the knife and communicate with the programmer if necessary. At the same time, if the bottom pad is square, the code must be aligned with the square of the pad to achieve the purpose of force balance.

8) When using a vise clamp, you must know the depth of the tool to prevent it from being too long or too short.

9) Screws must be included in the T-shaped block. Do not use only a part of the thread. If the screw is to be connected, the upper and lower screws must use the thread of the half joint. The thread of the nut on the pressure plate must be completely used. Thread.

10) When determining the Z depth number, you should see the position of the program single touch number and the data of the highest point of Z. After inputting the data into the machine tool, you must check it again.

Precautions for clamping tools

1) It must be firmly clamped and not too short in the handle.

2) Before each shovel, check whether the tool meets the requirements. The length of the knives should be determined according to the machining depth indicated by the program. Generally, it should be slightly longer than the machining depth value of 2mm and the shank should be considered.

3) If you encounter a deep processing depth, you can communicate with the programmer. If you want to use the knife twice, you should first obtain half the length of 2/3, and then wait longer when you process to a deeper position. This can improve processing efficiency.

4) When using the extension cord, you should especially know the depth of the lower knife and the required length of the knife.

5) Before the cutter head is installed on the machine, its taper fit position is cleaned with a cleaning cloth, and the corresponding position of the machine tool sleeve is also cleaned to avoid the iron filings on the mating surface affecting the accuracy and damage the machine tool.

6) Generally, the tool length is used for the tool length (in the case of the knife in the special case), the program order should be checked carefully.

7) When the program is interrupted or repaired, it is necessary to pay attention to whether the depth can be connected with the front. Under normal circumstances, the line can be adjusted upward by 0.1mm, and then adjusted according to the situation.

8) Rotating and removing the cutter head. If water-soluble cutting fluid is used, it should be immersed in lubricating oil for several hours every half month for maintenance, so that the internal parts of the cutter head can be lubricated without wear.

Precautions for correcting the alignment of the workpiece

1) When the workpiece is towed, you must pay attention to the verticality, while dragging, and then dragging the vertical edge.

2) When the workpiece is divided, it must be verified twice.

3) After the number of hits, the median size should be provided according to the program and the size on the parts map should be checked.

4) All workpieces must be divided into sub-centers. The zero position must be divided into the sub-centers and then moved to the side. It must be ensured that the balances on both sides are consistent. If a special case must be taken unilaterally, it must be confirmed by the production team before it can pass. After the unilateral number is taken, remember the radius of the rod in the compensation back.

5) The zero input of the workpiece center must be the same as the three-axis center of the workstation computer diagram.

Processing considerations

1) When the amount of the top surface of the workpiece is too large, use a large knife to manually remove the remaining amount, and remember not to be deep.

2) The most important processing is the first knife. If you carefully operate and check, you can know whether the tool length compensation, tool radius compensation, program, speed, etc. are wrong, to avoid damage to the workpiece, tool, and machine tool.

3) Trial the procedure as follows:

a) The height of the first point is up to 100mm, and it is correct to use the eye to feel it;

b) control “quick shift” to 25% and feed to 0%;

c) When the tool approaches (about 10mm) the working surface, the machine is suspended;

d) check the remaining stroke and the program is correct;

e) After turning on the power again, put one hand on the pause,, ready to stop at any time, and the other hand controls the feed speed;

f) When the tool is very close to the workpiece surface, it can be stopped again. The remaining stroke of the Z-axis must be checked.

g) After the machining is smooth and stable, return the control to the normal state.

4) After entering the program name, use the pen to copy the name of the program on the screen, and then check with the program. When opening the program, check whether the size of the tool in the program matches the program list, and sign the processor on the program. Fill in the file name and the size of the tool in the column, and do not fill it in afterward or beforehand.

5) In principle, the NC mechanic must not leave when the workpiece is roughed. If you need to change the knife or assist in adjusting other machine tools, you must ask other NC team members or check back regularly.

6) When doing medium light, the NC mechanic should pay special attention to the place where the opening is not open when the thickening is made to prevent the tool from hitting this area.

7) Program cutting. If the program breaks during processing and wastes too much time from the beginning, the team leader and the programmer should be notified to modify the program and cut off the part that has been done.

8) The program is abnormal. If the program has a different situation and is not sure, you can hang up to observe the process and then decide the next action.

9) The speed and speed provided by the programmer during the machining process can be adjusted by the NC mechanic as appropriate. However, special attention should be paid to the fact that small pieces of copper cannot be opened at a high speed to avoid loosening of the workpiece due to shock.

10) During the machining of the workpiece, the NC mechanic should check with the parts drawing to see if there is any abnormal condition. Once the two are found to be inconsistent, the team leader must be immediately shut down to check whether there is any error.

11) When using a tool with a length of more than 200mm, it is necessary to pay attention to the margin and the depth of the feed, the speed of the feed, etc., in order to avoid the knives, and the speed of the corner should be controlled.

12) The operator must be responsible for detecting the diameter of the tool on the program sheet. At the same time, the diameter of the test shall be recorded. If the tolerance is exceeded, it shall be immediately reported to the team leader or the tool change.

13) When the machine tool is in automatic operation or available, the operator should go to the workstation to learn about the remaining machining programming, prepare and grind the appropriate tool for the next machining standby to avoid downtime.

14) Process errors are the main reasons for wasting time: incorrect use of improper tools, processing errors, waste of time in locations where no machining or non-computer processing is required, improper use of machining conditions (slow speed, empty knife), the knife path is too dense, the feed is too slow, etc.), the above events can be contacted during programming.

15) During the machining process, attention must be paid to the wear of the tool. The blade or tool should be replaced appropriately. After replacing the blade, pay attention to whether the boundary of the machining is consistent.

Processing precautions

1) Confirm that each procedure and each instruction required by the procedure has been completed.

2) After the processing is completed, it is necessary to check whether the shape of the workpiece meets the requirements, and at the same time, the workpiece size self-test is performed according to the part drawing or the process drawing, and the error is found in time.

3) Check the position of the workpiece for any abnormality. If in doubt, notify the NC team leader.

4) The large group of workpieces must be notified to the team leader, programmer and production team leader.

5) Pay attention to safety when the workpiece is off the machine, especially when the workpiece is off the machine, the workpiece and the NC machine should be protected.

Ten years of mastering CNC machining experience collection!Just get it! 2

Different treatments of processing accuracy requirements

The surface quality of polished light:

1) mold core, insert

2) Tonggong

3) thimble plate support hole and other places to avoid vacancies

4) Eliminate the vibration of the knife

The size of the fine light:

1) Measurable size must be strictly performed after processing self-test

2) Consider the loss of the tool during long-term processing, especially the sealing position.

3) The fine light should use new cemented carbide tools as much as possible

4) Determine the modulus of the lens after finishing the light according to the processing requirements

5) Confirmation of quality after processing and quality

6) Control the tool loss during the processing of the sealant depending on the processing requirements

Hand over

1) Confirm the operation of the work, including the processing situation, mold conditions, etc.

2) Confirm that the working equipment of the shift is normal.

3) Other handovers and confirmations, including drawings, program sheets, tools, gauges, fixtures, etc.

Workplace finishing

1) Execute according to 5S requirements.

2) The tools, measuring tools, fixtures, workpieces, tools, etc. are placed neatly.

3) Cleaning of the machine tool.

4) Cleaning the workplace floor.

5) Returning the processed tool, idle tool and measuring tool.

6) The processed parts are sent to the product inspection or the corresponding department.

Deixe uma resposta

O seu endere?o de e-mail n?o será publicado. Campos obrigatórios s?o marcados com *

黄网官方在线观看| 亚洲国产嫩草18久久久| 女人被男人操到高潮视频| 欧美日韩亚洲人人夜夜澡| 尤物网三级在线观看| 市长含着秘书的奶头| 日韩乱码一区二区三区中文字幕| 找个日韩操逼的看看| 久久丁香花五月天色婷婷| 插插插插插插插插插插插| 人妻含泪让粗大挺进| 国产成人精品区在线观看| 中文字幕亚洲欧美精品一区二区| 国产成人亚洲欧美久久| 69亚洲一级黄片| 成年人的一级黄色带| 国产青青操骚货在线观看| 美女穿黑丝被大鸡巴猛操| 中文字幕不卡一区二区免| 日本二区在线观看| 色欲色欲色视频综合| 国产熟女50岁一区二区| 大鸡巴干浪穴视频| 午夜色大片在线免费观看| 大鸡巴日大鸡巴在线观看| 久久高清中文字幕第一页| 欧美国产三级片久久高清| 蜜臀AV无码国产精品尤物| 胸大裸体美女视频| 国产欧美日韩一区二区在线观看| 波多野结衣浴尿解禁在线| 国产蜜月精品高清一区二区三区| 久久一级高潮a免费| —级v免费大片欧美| 被医生添奶头和下面好爽| 欧美 日韩 亚洲 熟女| 尤物AV无码国产在线看| 欧美大鸡巴操大骚逼| 国产熟女露脸普通话对白| 挺进绝色邻居的紧窄小肉| 8050午夜三级的全黄|