欧美人妻精品一区二区三区99,中文字幕日韩精品内射,精品国产综合成人亚洲区,久久香蕉国产线熟妇人妻

Many customers complain that the service life of cemented carbide molds they buy is very short, and they often crack after less than oneortwo times of stamping. That’s because first of all, cemented carbide is a hard but brittle material, and special attention should be paid to the maintenance of cemented carbide molds in use. Secondly, customers usually haven’t considered these three aspects. Today we will share with you in an article how to extend the service life of your cemented carbide mold through these three points.

3 ASPECTS DETERMINE THE SERVICE LIFE OF YOUR CEMENTED CARBIDE MOLD 2

Have you selected cemented carbide molds with a good quality? ?

Quality includes the following:

1. It must have high resistance: the mold must accept great extrusion pressure, bending stress, impact and other messy loads at the same time during the extrusion process.

2. It must have very good wear resistance: the mold should have high wear resistance to ensure normal service life and produce a large number of qualified extrusions.

3. There must be sufficient thermal stability: during each continuous production, the temperature rise of the mold sometimes reaches or exceeds 200 ℃, which will reduce the strength and hardness of the mold material with 160~180 ℃ as the tempering temperature. Therefore, the mold material with higher temperature rise should have excellent tempering stability.

4. It must have outstanding technicality: the manufacturing cycle of cold extrusion die is long, the technology is messy, and the accuracy requirement is high. Generally, casting, cutting, heat treatment, grinding or other finish machining are required.

Do you use cemented carbide for production correctly?

When using cemented carbide dies, we should pay attention to the following points:

1. During the working process of the machine and equipment, the technician monitors the working condition of the equipment in real time to eliminate the machine faults in advance. Only in this way can we ensure the smooth progress of the whole production process.

2. The cemented carbide mold must be in a safe state before it is used and in the process of idle parking.

3. Cemented carbide dies belong to high maintenance rate equipment because of long-term load work. During maintenance, the machine should be firmly fixed with supports, the equipment should be shut down, and the whole set of equipment should be in a static state before starting the next step of maintenance work.

4. The gear oil in the cemented carbide mold is very irritating to the skin. When checking whether there is leakage, don’t touch it with your hands. If necessary, wear gloves or use paper to check, so as to avoid direct skin contact. Different cemented carbide molds need to be careful in the processing process, with safety as the main factor.

5. Select the appropriate reduction ratio. Cemented carbide die itself has the characteristics of hardness and brittleness. If it is used for shrinkage drawing with large area shrinkage, it is easy to cause the die to bear the stress and be broken and scrapped. Therefore, it is necessary to select the appropriate area shrinkage according to the different mechanical properties of wire rod.

3 ASPECTS DETERMINE THE SERVICE LIFE OF YOUR CEMENTED CARBIDE MOLD 3

Do you regularly repair your cemented carbide mold?

Regular maintenance of cemented carbide dies is a major factor that can effectively improve the service life of cemented carbide dies.

For example, the installation and debugging method of the mold should be appropriate. In the case of hot runner, the power wiring should be correct, the cooling water path should meet the design requirements, the parameters of injection molding machine, die casting machine and press machine should meet the design requirements in the production of the mold, etc.

When using the mold correctly, it is also necessary to maintain the mold regularly. The guide post, guide sleeve and other parts with relative movement of the mold should be often filled with lubricating oil. For forging mold, plastic mold, die-casting mold and other molds, lubricant or molding agent should be sprayed on the surface of formed parts before each mold is formed.

The planned protective maintenance of the mold and the data processing in the maintenance process can prevent the problems that may occur in the production of the mold and improve the efficiency of maintenance work.

Dodaj komentarz

Twój adres email nie zostanie opublikowany. Pola, których wype?nienie jest wymagane, s? oznaczone symbolem *

色狠狠久久av北条麻妃| 伊人网在线免费视频| 欧美国产三级片久久高清| 日韩伦理视频一区二区三区| 加勒比五月综合久久伊人| 黑丝美女被操到高潮| 国产剧情使劲操我逼| 亚洲中文字幕二区不卡| 96精品久久久久久蜜臀浪| 亚洲精品自拍偷拍第一页| 怎么样操女人的逼亚洲Av黄片段| 欧美办公室大鸡巴| 三上悠亚精品一区二区久久| 久久久久黑人强伦姧人妻| 欧美一区二区三区刘玥| 男生用鸡巴操女生的视频| 日韩av一区二区高清不卡| 国产精品亚洲一区二区三区下载| 99久久久国产精品k影| 日日爱黄色毛片视频| 日本入室强伦姧人妻中文| 日韩免费一级a毛片在线播放一级| 亚洲国产成久久成人综合一区| 60秒动态视频在线观看| 欧美性做爰片免费视频看| 精品一区二区久久久久无码| 日本十八禁大骚逼| 精品免费久久久久久久久| 美女逼男逼小穴小骚下载| 亚洲人成在线不卡网| 中文字幕在线观看第二页| 精品的极品美女一区二区三区| 大逼女人污污视频| 蜜臀av一区二区三区免费观| 无码一区二区三区色哟哟| 亚洲一区二区三区精品日韩| 男女真人牲交高潮全过程| 99久久99久久精品视频| 国产精品国产精黄 | 亚洲欧美一区二区三区孕妇| 久久久国产了楼凤|