Inspection of flange fasteners

1. ??? : ?? ?? ???? ??? ???? ???? ???? ???? ??? ??? ?????? ??????. ??? ???? ???? ? ????. ???? ?? ??? ???? ??? ??? ??? ??? ????? ??????.

2.Flange: check whether the flange face is damaged before installation, If scratches, nicks, mud, corrosion and burrs, dents and scratches passing through the water line of flange sealing surface in radial direction, and the depth of scratches is more than 0.2mm, and the covering surface is more than half of the width of gasket sealing surface, the flange must be replaced or the sealing surface must be reprocessed and repaired; the position of nut support surface on the back of flange should be parallel and smooth; check whether the flange is aligned, and the inspection method shall be in accordance with 6.2 of sh3501-2011 Pipeline installation requirements.

3.Bolt and nut: check whether the bolt and nut are used correctly according to the design requirements of equipment and pipeline; the thread and contact surface shall be free of dirt, rust, double skin, scratch, burr, debris and other external substances that affect the torque in the tightening process; it is not allowed to repair the bolt by welding or machining; at least two threads shall be exposed outside the nut after the flange is installed and tightened;

Bolts and nuts must be lubricated before use, so as to have low friction coefficient when tightening bolts and improve the anti sliding wire and anti-corrosion performance of bolts and nuts; stud thread, nut thread and contact surface must be degreased and dried before using lubricating oil; unified lubrication method shall be properly used for bolt thread, nut thread, nut bearing surface, washer and nut supporting surface on flange Lubricating oil; use high temperature anti seizing agent as required.

Bolt tightening method

No torque box spanner or hammer spanner: suitable for fastening flange of general equipment and pipeline, selected according to bolt size and flange pressure grade. The tightening requirements are as follows:

1. The maintenance unit formulates the fastening scheme, fastens the flange symmetrically, and numbers the fastening sequence. Refer to Fig. 1 and Fig. 2 for numbering.

2. Position the gasket with 4 bolts at the positions of 1, 2, 3 and 4 to ensure that the center of the spiral wound gasket is within the flange edge.

3. Tighten the positioning bolt by hand, then insert other stud bolts and balance the load by hand, so as to ensure that at least 2 threads are exposed at each end of the nut.

4. According to the on-site equipment and flange, the tightening times (at least 3 times) and the hammering load (strength) of each tightening should be reasonably determined according to the calculation of tightening one circle. The tightening hammering load (strength) should be tightened from small to large in turn (such as 50%, 80%, 100% increment). The load should not be too fast or too large to prevent gasket seal failure.

5. Tightening sequence of no torque box spanner or hammer spanner each time:

Tighten the two radially opposite bolts to the given hammering load (strength) of the bolts;

Fasten another pair of bolts about 90 degrees away from the previous two bolts along the circumference;

Continue tightening until all the remaining bolts are tightened to a given hammer load.

Finally, according to 100% hammering load (force), all bolts shall be tightened clockwise or counterclockwise.

Tightening technical requirements for installation process of equipment and pipeline flange 2
Tightening technical requirements for installation process of equipment and pipeline flange 3

Torque wrench: suitable for high temperature, high pressure, flammable and explosive equipment and pipe flange.

The tightening requirements are as follows:

1. The maintenance unit needs to formulate the fastening scheme, formulate the appropriate torque, and carry out the design review according to the bolt strength, the initial sealing pressure of the gasket, the working sealing pressure, the medium pressure and other parameters, so as to prevent the bolt from breaking and the gasket from losing its elasticity due to the excessive pressing force, resulting in the seal failure.

2. Fasten the flange symmetrically and number the tightening sequence. Refer to figure 1 and Figure 2 for numbering.

3. Position the gasket with 4 bolts at the positions of 1, 2, 3 and 4 to ensure that the center of the spiral wound gasket is within the flange edge.

4. Tighten the positioning bolt by hand, then insert other stud bolts and balance the load by hand, so as to ensure that at least 2 threads are exposed at each end of the nut.

5. According to the on-site equipment and flange, the tightening times (at least 3 times) and each tightening torque should be reasonably determined according to the calculation of tightening one circle. The tightening torque should be tightened from small to large in turn (such as 50%, 80%, 100% increment). The load should not be too fast or too large to prevent the gasket sealing failure.

6. Tightening sequence of torque wrench each time:

Tighten the two radially opposite bolts to the given bolt torque;

Fasten another pair of bolts about 90 degrees away from the previous two bolts along the circumference;

Continue tightening until all the remaining bolts are tightened to the specified torque.

7. Finally, tighten all bolts clockwise or counterclockwise according to 100% torque value.

8. Record the torque value for reference in future maintenance.

Bolt stretcher: suitable for high temperature, high pressure, flammable and explosive equipment and pipe flange.

The tightening requirements are as follows:

1. The maintenance unit formulates the fastening scheme, formulates the appropriate stretching force, and carries out the design review according to the bolt strength, the initial sealing specific pressure of the gasket, the working sealing specific pressure, the medium pressure and other parameters, so as to prevent the bolt from breaking and the gasket from losing its elasticity due to the excessive pressing force, resulting in the seal failure.

2. When the bolt stretcher single (step-by-step) stretches and fastens the bolt, it should follow the principle of bolt tightening uniformity and refer to the tightening sequence of torque wrench.

3. In the process of bolt stretching and fastening, the number of times of stretching and fastening should be reasonably determined. The pressure should be increased from small to large in turn (such as 50%, 80%, 100%), and evenly. Every time a certain pressure is increased, the pressure should be stabilized and then increased, so as to avoid excessive impact tension and affect the bolt pre tightening effect.

4. Record the pressurization value for reference in future maintenance.

?? ???

???? ???? ????. ?? ???? * ? ???? ????

日韩国产精品视频一区| 老头鸡巴操老太骚逼| 大肌巴日小个子女人视频| 思思夜免费公开视频| 日本欧美一区二区三区| 国产情侣色综合久久有码| 性色av少妇一区二区三区多人| 日韩欧美视频在线观看不卡| 几把日逼嗯嗯视频| 97人人澡人人爽人人揉| 人妻波多野结衣爽到喷水| 国产一区二区三区在线观| 免费看澡美女逼视频看看| 中日美女毛5片一区二区三区| 91久久愉拍愉拍国产一区| 少妇毛片一区二区三区免费视频| 操小骚逼高潮视频| 乱伦美女小骚货视频| 国产精品亚洲综合av| 美女主播被操流水| 一区二区三区亚洲av| 国产午夜高清无码一级片| 视频在线观看一区@99| 欧美久久精品免费看C片| 美女大鸡操很多水在线看| 久久综合娱乐中文网| 国产合区在线一区二区三区| 三上悠亚精品一区二区久久| 黑人巨茎和中国美女视频| 阴茎大头插少妇蜜穴视频| 区国产精品搜索视频| 操女人逼逼骚逼逼| 日韩成人伦理片在线观看| 成人久久久久久蜜桃免费| 帅哥大鸡巴操美女| 久久久精品欧美一区二区三免费| 正在播放 国产精品推荐| 五月天亚洲激情综合av| 白色紧身裤无码系列在线| 加勒比在线不卡一区二区观看| 被大鸡巴操淫液视频|